BSS Mission Mile: Sepulveda Visioning for a Safe and Active Community
ATPL-5006(920)
7 $79.6M Design Active Transportation Program Cycle 5
— — BSS Broadway-Manchester Active Transportation Equity Project
ATPL-5006(895)
8 $68.4M Construction ATP Cycle 4
— — BSS Western Our Way: Walk and Wheel Improvements
ATPL 5006 (947)
8 $54.4M Design Active Transportation Program Cycle 6
— — BSS Connecting Canoga Park through Safety and Urban Cooling
ATPL-5006(918)
3 $53.7M Pre-Design Active Transportation Program Cycle 5
— — BSS Osborne St: Path to Park Access Project
ATPL 5006 (946)
7 $49.8M Pre-Design Active Transportation Program Cycle 6
— — BSS Skid Row Connectivity and Safety Project
ATPL 5006 (944)
14 $47.6M Pre-Design Active Transportation Program Cycle 6
6/30/2026Expired Applies to the PA&ED phase only. If it lapses, only that phase's share of the grant is at risk — not the entire award.
⚠ BSS Wilmington Safe Streets: A People First Approach
ATPL 5006 (945)
15 $40.8M Pre-Design Active Transportation Program Cycle 6
6/30/2026Expired Applies to the PA&ED phase only. If it lapses, only that phase's share of the grant is at risk — not the entire award.
⚠ BSS Broadway-Manchester Multi-Modal Green Streets Project (Measure W)
ATPL-5006 (895)
8 $38.6M Design Safe Clean Water Program Round 2
— — BSS Boyle Heights Community Connectivity Project
ATPL - 5006 (951)
14 $37.7M Pre-Design Active Transportation Program Cycle 6
6/30/2026Expired Applies to the PA&ED phase only. If it lapses, only that phase's share of the grant is at risk — not the entire award.
⚠ LADOT CA-2023-131-00
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 $36.5M Active
Total FTA Funds: $24,422,282 Total Local Match $12,048,000 Total Eligible Project Cost: $36,470,282
4/30/2028 — BSS Eagle Rock Bl Multi-Modal Transportation Improvements
STPL-5006(907)
14 $33.5M Pre-Design SR 710 MIP, Measure W
— — LADOT ATP 6: SRTS Center City Schools Neighborhood Safety & Climate Resilience Project
DOT214
1, 10, 13 $30.8M Design ATP: $30,766,000.00 PropC: $5,472,000.00 Total funding: $36,238,000.00
8/30/2030 — BSS Normandie Beautiful: Creating Neighborhood Connections in South L.A
ATPL 5006 (948)
8 $27.8M Pre-Design Active Transportation Program Cycle 6
— — LADOT CFP2009, CRRSAA & WSCCOG: Exposition II- West Bikeway Northvale Segment
DOT171
5 $26.2M Design CMAQ: $4,416,000.00 MMLRF: $3,168,000.00 Oth: $3,200,000.00 PropC: $2,826,000.00 SCAG: $13,279,500.00 ST: $5,293,000.00 Total funding: $32,182,500.00
12/31/2026 i ⚠ LADOT ATP 4: SRTS Liechty Middle and Neighborhood ES
DOT164
1 $25.4M Design ATP: $23,198,000.00 CTIEP: $852,625.00 PropC: $6,087,000.00 SCAG: $2,200,000.00 Total funding: $32,337,625.00
6/30/2031 — BOE Eastern Avenue Multi-Modal Transportation Improvement Project - STPL-R & CMAQ Funds
— $24.9M —
—
12/31/2026 ⚠ LADOT CA-2019-115-00
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 $23.4M Active
Total FTA Funds: $18,292,150 Total Local Match: $5,089,144 Total eligible cost: $23,381,294
9/1/2028 — LADOT CA-2020-215-00
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 $22.1M Active
Total FTA Funds: $16,192,200 Total Local Match: $5,909,830 Total Eligible Cost: $22,102,030
9/1/2028 — LADOT San Fernando Rd Bikepath Phase IIIA Construction
DOT084
2, 6 $21.2M Construction ATP: $21,195,000.00 PropC: $4,235,000.00 Total funding: $25,430,000.00
6/30/2027 — LADOT CA-2025-243-00
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 $19.2M Active
Total FTA Funds: $15,364,711 Total Local Match: $3,841,181 Total Eligible Cost: $19,205,891
8/1/2028 — BOE ATP Cycle 4 - LA Riverway Segment 1 and 2
— $18.6M —
—
7/30/2026Expired ⚠ LADOT Pico Safety and Mobility Plan Project
1, 9, 10 $18.4M Design MAT Cycle 2: $15,467,473 In-house Vision Zero Program amount TBD (likely to use SB1 local returns)
29/30 — LADOT ATSAC Enhancements for an Advanced Transportation Infrastructure TLSP-5006(913)
DOT204
— $18.4M Construction Oth: $18,361,000.00 PropC: $400,000.00 Total funding: $18,761,000.00
6/30/2026 i Expired — LADOT Universal Basic Mobility: Phase I South LA UBM Pilot
8, 9, 10 $13.8M Operations
MMLRF: $438,509.76 Oth: $5,927,017.84 CARB STEP: $13,843,298
4/30/2027 i — BSS 67th Street and West Boulevard Civil Improvements Project
8 $13.0M Pre-Construction —
— — LADOT Boyle Heights/Cesar Chavez Great Streets -Brittania St. to Evergreen Ave.
DOT167
14 $12.7M Construction CMAQ: $10,787,000.00 MeasR: $1,916,389.00 PropC: $2,523,000.00 Total funding: $15,226,389.00
12/31/2029 — BOE ATP Cycle 3- Downtown Los Angeles Arts District Pedestrian and Cyclist Safety Project
— $12.3M —
—
9/30/2026Expiring soon ⚠ BSS Northeast LA Active Transportation & Transit Connectivity Enhancements
STPL-5006(906)
14 $11.5M Pre-Design SR 710 MIP, RIP-STP
— — BSS SRTS Berendo Middle and Leo Politi, Hoover Street, and Magnolia Avenue Elementary Schools Project
ATPL-5006(930)
1 $11.1M Design ATP Cycle 5
— — LADOT WSCCOG: Santa Monica to Westwood Stress-Free Bicycle Enhanced Corridor
DOT192
5, 11 $10.4M Design MMLRF: $10,406,584.00 Total funding: $10,406,584.00
6/30/2028 — BSS Pico Blvd and Flower St Improvements (RCN Grant)
N/A
14 $10.0M Design FTA Recoonecting Community and Neighbor Grant
— — LADOT Grand/Chavez First-Last Mile Improvements Project
1, 13, 14 $10.0M Design MAT Cycle 2: $10,000,000
6/30/2031 — BOS SB 1383 Local Assistance (OWR4)
— $9.8M —
—
11/2/2026Expiring soon — LADOT WSCCOG: Westwood Boulevard Safety and Mobility Project
DOT221
5 $9.6M Design MMLRF: $9,600,000.00 Total funding: $9,600,000.00
6/30/3031 — LADOT CA-37-X123
13, 14 $8.4M Design FTA JARC: $8,350,000
Local: $100,000
TDC: $2,925,000
5/1/2026 i Expired ⚠ BSS Wayfinding & Transit Amenities in Downtown Los Angeles
14 $8.4M Pre-Design —
— — LADOT MAT Cycle 1: Avalon / Martin Luther King / Gage Corridor
DOT190
9 $8.0M Design MMLRF: $8,023,724.00 PropC: $2,176,276.00 Total funding: $10,200,000.00
6/30/2028 — BSS Maya Corridor Streetscape
1 $7.7M Construction CRA/LA Excess Bond Proceeds
— — BOS Hollenbeck Park Lake Rehabilitation
— $7.0M —
—
6/30/2026Expired — BOS Slauson Wall Cleanup Project
— $6.9M —
—
2/26/2027 — LADOT CFP2009 & CRRSAA: L.A. River Bike Path - Phase IV Construction
DOT060
4 $6.8M Design CMAQ: $1,827,000.00 Oth: $4,959,630.00 PropC: $457,000.00 Total funding: $7,243,630.00
12/31/2026 i ⚠ BSS Martin Luther King (MLK) Bl Streetscape
9 $6.5M Design CTIEP
— — LADOT HSIP 8 Left Turn Signal Modification and Median Island
DOT177
2, 3, 4, 6, 7, 8, 9, 11, 12, 15 $6.2M Construction CTIEP: $2,000,000.00 HSIP: $5,244,400.00 Oth: $334,964.34 PropC: $582,711.11 ST: $1,000,000.00 Total funding: $9,162,075.45
6/30/2028 — LADOT WSCCOG: Connect Del Rey Stress-Free Bicycle Enhanced Corridor
DOT194
11 $6.2M Design MMLRF: $6,212,768.00 Total funding: $6,212,768.00
6/30/2029 — LADOT ATP 5: SRTS Panorama City Elementary School Project
DOT196
6 $6.1M Design ATP: $6,149,000.00 PropC: $683,000.00 Total funding: $6,832,000.00
6/30/2031 — LADOT ATP 5: SRTS Carver Middle and Ascot Avenue and Harmony Elementary Schools Project
DOT197
9 $6.0M Design ATP: $6,030,000.00 PropC: $670,000.00 Total funding: $6,700,000.00
6/30/2031 — BSS El Sereno Active Transportation & Transit Connectivity Enhancements
STPL-5006(911)
14 $6.0M Design SR 710 MIP
— — LADOT ATP 4: SRTS 112th St. and Flournoy ES Safety IMPR Project
DOT163
15 $5.6M 50% Bid & Award (Active)
ATP: $5,600,000.00 PropC: $1,399,000.00 Total funding: $6,999,000.00
3/21/2031 — LADOT Chandler Cycletrack Gap Closure Project
DOT137
2, 4 $5.1M Construction CMAQ: $3,177,750.00 PropC: $794,437.00 ST: $1,900,000.00 Total funding: $5,872,187.00
6/30/2028 — LADOT Figueroa Street Mall 2028
14, 9 $5.1M Design Metro Open Streets: $1,032,549 SS4A: $2,862,500
12/30/2028 — BSS Clean CA - Martin Luther King Jr. Boulevard Equity & Connectivity through Greening
CCL-5006(936)
9 $5.0M Construction Clean California Local Grant Program
— — BOS Hyperion 2035: Phase 1
— $5.0M —
—
11/30/2028 — BSS Clean CA - Creating Urban Habitat & Biodiversity through Median Greening
CCL-5006(934)
1, 8, 9, 10, 15 $5.0M Construction Clean California Local Grant Program
— — LADOT HSIP 8 - New Signals
DOT176
3, 5, 6, 8, 9, 10 $4.8M Construction CTIEP: $1,580,097.13 HSIP: $4,755,600.00 PropC: $528,400.00 Total funding: $6,864,097.13
6/30/2027 — LADOT 2017 Earmark - Northeast Valley Traffic and Mobility Improvements
DOT153
7 $4.7M Construction PropC: $1,165,536.00 SAFTLU: $4,662,146.00 Total funding: $5,827,682.00
6/30/2027 — LADOT Olympic Blvd and Mateo Street Imp
DOT178
14 $4.6M Construction LT: $4,624,000.00 PropC: $2,490,308.00 Total funding: $7,114,308.00
2/28/2026 i Expired — LADOT HSIP 7 - Left Turn Phasing - 17 locations citywide
DOT174
2, 4, 8, 9, 10, 12, 15 $4.5M Construction HSIP: $4,496,900.00 Total funding: $4,496,900.00
6/30/2028 — LADOT ATP 4: SRTS Alexandria Avenue ES Neighborhood Safety IMPR Project
DOT165
10, 13 $4.5M Design ATP: $4,480,000.00 PropC: $1,120,000.00 Total funding: $5,600,000.00
6/30/2030 — LADOT Central LA MSP 2021: Lockwood Ave ES SRTS Plan
DOT208
13 $4.4M Pre-Design MMLRF: $4,400,000.00 Total funding: $4,400,000.00
N/A Project funds to be repurposed i — LADOT Traffic Signal Rail Crossing Improvement Project
DOT131
— $4.2M Construction LT: $4,179,400.00 PropC: $1,044,850.00 Total funding: $5,224,250.00
2/28/2026Expired ⚠ LADOT CA-2024-148-00
15 $4.1M Active
Total FTA Funds: $3,136,998
Total Non-Federal Share $829,250
Total Eligible Project Cost: $4,146,247
3/31/2029 — LADOT HSIP 7 - RRFB Ramps and Median Islands - 28 locations
DOT175
1, 4, 5, 8, 9, 11, 13, 14, 15 $4.1M Construction HSIP: $4,140,800.00 Total funding: $4,140,800.00
6/30/2028 — LADOT Universal Basic Mobility: Phase II South LA EcoLab
DOT220 DOT218
8, 9 $4.1M Construction PropC: $67,212 MMLRF: $132,235 Prop A: $67,775 Measure R: $250,000 Oth: $1,100,000 TCC: $4,130,028
3/31/2029 — LADOT CA-2020-202-01
14 $4.0M Active
Total FTA Funds: $3,215,977 Total Local Match $803,994 Total Eligible Project Cost: $4,019,971
1/1/2027 i ⚠ BSS MAT FLM - Sepulveda/OL
4, 6 $3.6M Design Measure M MAT - Metro Active Transport
— — LADOT Mid City - Low Stress Bicycle Enhancement Corridors
DOT147
4, 13 $3.6M Construction CMAQ: $1,806,765.00 CTIEP: $1,810,500.00 PropC: $883,629.00 SCAG: $1,810,419.00 Total funding: $6,311,313.00
6/30/2028 — BOS HWRP Modernization: Discharge Piping Separation
— $3.5M —
—
6/30/2029 — BOE Surface Transportation Program – Local Regional Funds (Soto St Widening between Multnomah and Mission)
— $3.4M —
—
6/30/2030 ⚠ BSS MAT (FLM) Aviation/LAX
— $3.3M Design —
— — LADOT SBCCOG MSP: Crossing Upgrades
DOT161
15 $3.3M Design MMLRF: $3,260,625.00 Total funding: $3,260,625.00
6/30/2030 — LADOT TCC - Watts Rising - Walkbike Watts
DOT181
15 $3.1M Construction Oth: $3,092,760.00 Total funding: $3,092,760.00
12/31/2025 i Expired — LADOT SBCCOG MSP: Wilmington Neighborhood Friendly Streets
DOT159
15 $3.0M Pre-Design MMLRF: $3,000,600.00 Total funding: $3,000,600.00
6/30/2030 — BSS Revitalize Rose Avenue - A Pedestrian Connectity & Beautification Project
11 $3.0M Construction —
— — LADOT ATCMTD - Mobility enhancements and traffic safety in the Los Angeles Promise Zone
DOT212
— $3.0M Construction Oth: $3,000,000.00 Total funding: $3,000,000.00
5/31/2027 ⚠ BOS BeLeaf in Equity
— $3.0M —
—
2/28/2029 — BOS Volkswagen Environmental Mitigation Trust Program 2021 - Volkswagen Environmental Mitigation Trust Program 2021
— $3.0M —
—
6/30/2027 ⚠ LADOT Central LA MSP 2021: Integrated Mobility Hubs Program
GM41
13, 14 $2.8M Design MMLRF: $2,790,491.00 Total funding: $2,790,491.00
5/20/2029 — BSS Brentwood Walkability Enhancements
MM4801.08
11 $2.6M Construction Measure M MSP - Active Transportation
— — LADOT SBCCOG MSP: Signal Operational Improvements
DOT160
15 $2.5M Construction MMLRF: $2,500,000.00 Total funding: $2,500,000.00
6/30/2029 — LADOT HSIP 11 - Figueroa Priority Corridor Systemic Safety Improvements
DOT215
8, 9 $2.4M 0% Bid & Award (Active)
HSIP: $2,383,830.00 PropC: $264,870.00 Total funding: $2,648,700.00
2/28/2029 — BSS Walk Pico! A Catalyst for Community Vitality & Connectivity
CML-5006(862)
5 $2.3M Construction 2013 Metro Call for Projects
— — BSS Washington Bl Transit Enhancements Phase 2
CML-5006(856)
9, 14 $2.3M Construction 2011 Call for Projects/CRA
— — BSS L.A. River Bike Path - Phase IV Construction
4 $2.3M Design Metro Call for Projects
— — LADOT SBCCOG MSP: ATSAC Communications System Resiliency Improvement in San Pedro
DOT157
15 $2.3M Construction MMLRF: $2,500,000.00 Total funding: $2,500,000.00
12/31/2026 i — BOE CA Natural Resources Agency - Urban Greening Grant
— $2.2M —
—
3/1/2028 ⚠ LADOT Central LA MSP 2021: Los Angeles SRTS Elementary School
DOT206
10 $2.1M Pre-Design MMLRF: $2,098,103.00 Total funding: $2,098,103.00
N/A Project funds to be repurposed i — LADOT TCC: South LA Eco Lab - EV Carshare
DOT219
8, 9, 10 $2.1M Cancelled
Oth: $1,468,475.00 TCC: $2,097,160.00 Total funding: $3,565,635.00
9/30/2025Expired — LADOT San Fernando Rd Widening at Balboa Rd
DOT179
12 $2.1M Construction CMAQ: $1,061,000.00 CTIEP: $1,409,698.00 Oth: $1,000,000.00 PropC: $1,109,462.00 Total funding: $4,580,160.00
6/30/2028 — LADOT Wilshire Open Street: Park to Park a Westlake Celebration 2028
1, 10 $2.0M Design Metro Open Streets: $163,611
SS4A: $1,431,250
12/30/2028 — LADOT 2016 Earmark - Install Leading Pedestrian Interval (LPI), Pedestrian Actuated Warning Devices (AWDs
DOT152
1, 2, 3, 4, 6, 11, 12, 13 $2.0M Construction CTIEP: $492,000.00 Oth: $1,846,102.00 PropC: $2,010,371.00 Total funding: $4,348,473.00
6/30/2025 i Expired — LADOT SR710 LATIP: DASH El Sereno / City Terrace
DOT155
14 $2.0M 99% Right of Way/Approvals (Active)
CMAQ: $2,000,000.00 Total funding: $2,000,000.00
1/31/2032 — LADOT SMART: Code the Curb: DTLA (Digital Curb Management)
DOT216
9, 14 $2.0M Completed
Oth: $2,000,000.00 Total funding: $2,000,000.00
12/15/2025Expired — BOS Taylor Yard G2-Central Brownfield Cleanup
— $2.0M —
—
9/30/2027 — LADOT HSIP 10 - Retroreflective backplate upgrades
DOT203
— $1.9M Construction HSIP: $1,884,000.00 Total funding: $1,884,000.00
6/30/2029 — LADOT Imperial Highway Bike Lanes
DOT056
11 $1.9M Construction CMAQ: $1,858,000.00 PropC: $464,000.00 Total funding: $2,322,000.00
6/30/2027 — LADOT Hollywood Open Street 2028
13 $1.8M Design SS4A: $1,431,250
12/30/2028 — LADOT SBCCOG MSP: ATSAC Fiber Communications Network Integration with LA County
DOT158
15 $1.8M Construction MMLRF: $2,000,000.00 Total funding: $2,000,000.00
12/31/2026 i — LADOT Central Avenue Historic Corridor Streetscape - LAF3656
DOT199
9 $1.7M Construction CTIEP: $6,600,000.00 PropC: $891,000.00 RSTP: $1,697,000.00 Total funding: $9,188,000.00
6/30/2030 — LADOT Menlo Ave / MLK Vermont Expo Station Ped Improvements
DOT076
9 $1.7M Design CMAQ: $1,687,350.00 PropC: $1,615,000.00 Total funding: $3,302,350.00
12/31/2026 i ⚠ LADOT Central LA MSP 2021: Manchester Elementary SRTS
DOT213
8 $1.6M Construction MMLRF: $1,623,500.00 Total funding: $1,623,500.00
6/30/2028 i — LADOT North Hollywood Open Street 2028
2 $1.6M Design Metro RCN Grant: $1,600,000
12/30/2028 — LADOT Universal Basic Mobility: Phase III UBM E-bike Voucher Program
— $1.5M Design Metro Call for Projects: $1,518,124 MMLRF: $398,267 LCFS: $1,500,000
3/31/2029 — LADOT SR710 LATIP: DASH Highland Park / Eagle Rock
DOT156
14 $1.5M Construction CMAQ: $1,500,000.00 Total funding: $1,500,000.00
1/1/2028 i — BOS GREENfiltration - Urban and Community Forestry Grant Program
— $1.5M —
—
3/30/2026Expired ⚠ BSS Laurel Canyon Blvd and Wicks St. ADA Improvements
CD 6 $1.5M Design —
— — LADOT Pedestrian Improvements along Central Ave from Washington to Vernon Ave
DOT198
9 $1.5M Design CTIEP: $1,500,000.00 PropC: $414,000.00 SAFTLU: $1,490,234.00 Total funding: $3,404,234.00
6/30/2030 — LADOT ATP 2 - Pedestrian and Bicycle Neighborhood Intersection Enhancements
DOT162
5, 7, 9, 14 $1.4M Construction ATP: $1,396,000.00 PropC: $349,000.00 Total funding: $1,745,000.00
6/30/2025 i Expired — LADOT CA-2025-253-00
13, 14 $1.4M Design Total FTA Funds: $1,208,000 Total Local Match: $156,509 Total eligible cost: $1,364,509
5/20/2029 — LADOT Valencia Triangle Landscape Beautification Plaza
DOT101
1 $1.3M Design LT: $553,000.00 MMLRF: $733,397.00 PropC: $298,000.00 Total funding: $1,584,397.00
6/30/2027 — LADOT Esperanza Elementary SRTS
DOT096
1, 13 $1.2M Design MMLRF: $1,072,461.16 SafeRt: $171,500.00 Total funding: $1,243,961.16
6/30/2027 — LADOT Balboa Bl Widening at Devonshire Street - 2011 Call
DOT166
12 $1.2M Construction CTIEP: $1,569,392.00 PropC: $650,629.00 RSTP: $1,208,311.00 Total funding: $3,428,332.00
6/30/2026 i Expired — BSS San Vicente Median Greening
11 $1.2M Design Design
— — LADOT Westlake MacArthur Park Pedestrian Improvement
DOT108
1 $1.2M Construction CMAQ: $1,182,666.00 PropC: $295,667.00 Total funding: $1,478,333.00
6/30/2028 — LADOT Western Av Bus Stop & Pedestrian Improvement
DOT107
8, 10 $1.2M Construction CMAQ: $1,178,000.00 PropC: $294,500.00 Total funding: $1,472,500.00
6/30/2025 i Expired — BOS Vermont Avenue Stormwater Capture
— $1.1M —
—
6/30/2021Expired — LADOT LANI - West Boulevard Community Linkages Project
DOT149
8 $1.1M 0% Right of Way/Approvals (Active)
CMAQ: $1,059,744.00 PropC: $264,937.00 Total funding: $1,324,681.00
6/30/2028 — LADOT HSIP 6 Project 3 - RRFB and New Traffic Signals at 27 Locations
DOT173
1, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 $1.0M Construction HSIP: $1,003,520.00 Oth: $2,638,704.30 PropC: $143,400.00 Total funding: $3,785,624.30
6/30/2029 — BSS Cycle 10 Highway Safety Improvement Program - Guardrail Upgrades
HSIPSL-5006(926)
CW $1.0M Construction HSIP Cycle 10
— — LADOT CA-37-X100 - Operating
— $1.0M Completed final drawdown
FTA JARC: $500,000
Local: $500,000
10/17/2028 i — LADOT Bicycle Corral Program Launch
DOT202
— $972K 10% Bid & Award (Active)
CMAQ: $972,000.00 PropC: $244,000.00 Total funding: $1,216,000.00
6/30/2031 — BOS Beverage Container Recycling (2024-25)
— $948K —
—
1/5/2027 — BOS Beverage Container Recycling (2025-26)
— $943K —
—
1/5/2028 — BOS Beverage Container Recycling (2023-24)
— $940K —
—
6/30/2026Expired — BOS Electric Refuse Collection Vehicles
— $900K —
—
8/29/2029 — LADOT HSIP 6 - 5 New Signals in HW and SP
DOT050
8, 13, 15 $888K Construction CTIEP: $500,000.00 HSIP: $888,200.00 Oth: $944,866.65 PropC: $98,800.00 Total funding: $2,431,866.65
6/30/2026 i Expired — LADOT HSIP 6 - Olympic Blvd Pedestrian Crossing Safety Enhancements
DOT172
14 $861K Construction HSIP: $861,300.00 Oth: $73,500.00 PropC: $95,700.00 Total funding: $1,030,500.00
6/30/2025 i Expired — BSS Chandler Blvd. Phase 2 - Strohm Ave
2 $850K Complete —
— — LADOT HSIP 6 - 5 New Signals
DOT049
4, 5 $846K Construction CTIEP: $500,000.00 HSIP: $845,800.00 Oth: $650,287.01 PropC: $94,100.00 Total funding: $2,090,187.01
6/30/2026 i Expired — LADOT LANI - Evergreen Park Street Enhancement
DOT062
14 $844K Construction CMAQ: $844,000.00 Oth: $10,000.00 PropC: $222,023.00 Total funding: $1,076,023.00
6/30/2026 i Expired — LADOT HSIP 6 - Traffic Signal Modifications at 7 Locations in SFV
DOT055
2, 6, 2008 $731K Construction CTIEP: $500,000.00 HSIP: $730,700.00 Oth: $1,468,946.49 PropC: $81,400.00 Total funding: $2,781,046.49
6/30/2026 i Expired — LADOT CicLAvia: South LA Open Street 2026
14, 9 $715K Design Metro Open Streets: $500,000
12/30/2028 — LADOT Experience the Sepulveda Basin Open Street 2028
— $715K Design Metro Open Streets: $500,000
12/30/2028 — LADOT CicLAvia: South LA Open Street 2028
14, 9 $715K Design Metro Open Streets: $500,000
12/30/2028 — BOS Lopez Canyon Hazardous Fuels Reduction - Fire Prevention Grants Program
— $659K —
—
3/15/2026Expired ⚠ BOS North Sepulveda Pedestrian Island
— $657K —
—
4/30/2027 — LADOT CA-37-X100 - Capital
— $609K 50% Bid & Award (Active)
FTA JARC: $487,287
Local: $121,822
10/17/2028 i ⚠ LADOT Bicycle Friendly Street Treatments
DOT016
10 $586K 80% Bid & Award (Active)
CMAQ: $585,510.00 PropC: $146,378.00 Total funding: $731,888.00
6/30/2030 — BSS Abbot Kinney LGBTQ Crosswalk
11 $574K Complete —
— — BOS Used Oil Payment Program - 15th Cycle
— $522K —
—
6/30/2026Expired — BOS Used Oil Payment Program - 16th Cycle
— $507K —
—
6/30/2027 — LADOT Central LA MSP 2021: New Pedestrian Crossing at Crenshaw and Brynhurst Ave
DOT205
8 $500K Construction MMLRF: $500,000.00 Total funding: $500,000.00
6/30/2026Expired — BOS Brownfields USEPA Community Wide Assessment FY25
— $500K —
—
10/31/2029 — BOS Crocker Street Brownfields Clean Up
— $500K —
—
10/31/2026Expiring soon ⚠ BOS Paseo Del Rio Cleanup
— $500K —
—
10/31/2026Expiring soon ⚠ BOS Slauson Corridor: Making Connections
— $500K —
—
12/31/2026 — BSS Warner Center - Civic Engagement, Equity and Environmental Justice (CEEEJ) Grant
SCAG Overall Work Program (OWP): 275.4823.08
3 $500K Complete SCAG CEEEJ Grant
— — BOS Fork-to-Fuel Pilot Program
— $450K —
—
1/31/2027 — LADOT Central LA MSP 2021: Active Streets LA - South Los Angeles - Northern Segments
DOT209
8, 9 $448K Design MMLRF: $447,650.00 Total funding: $447,650.00
6/30/2027 — LADOT CicLAvia: Meet the Hollywoods 2026
13, 4 $420K Design Metro Open Streets: $320,000
12/30/2028 — LADOT Bicycle Wayfinding Signage Program
DOT017
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12 $403K 2% Bid & Award (Active)
CMAQ: $403,000.00 PropC: $101,000.00 Total funding: $504,000.00
6/30/2028 — LADOT Central LA MSP 2021: New Pedestrian Crossing at Spring St and Ann St
DOT210
1 $400K Design MMLRF: $400,000.00 Total funding: $400,000.00
6/30/2027 — BOS Growing Community Through Compost in LA
— $400K —
—
5/31/2026Expired — BSS Harvard - Franklin Crosswalk Improvements
— $393K Complete —
— — LADOT LANI - Byzantine Latino Quarters
DOT066
1 $360K To Be Cancelled (Active)
PropC: $90,000.00 SAFTLU: $360,000.00 Total funding: $450,000.00
6/30/2026Expired — BOS Cleanup Initiative for the Greater Downtown LA Region
— $300K —
—
11/1/2027 — LADOT CA-37-X123 - Capital
— $235K 50% Bid & Award (Active)
FTA JARC: $188,215
Local: $47,053
10/17/2028 i ⚠ LADOT Wilshire Open Street: Park to Park a Westlake Celebration 2026
1, 10 $234K Design Metro Open Streets: $163,611
12/30/2028 — BOS Smart Meter Installation Project
— $200K —
—
6/30/2027 — BOS Turning Waste into Wealth
— $200K —
—
6/30/2027 — LADOT LANI - Koreatown
DOT067
10 $180K Construction PropC: $66,998.00 SAFTLU: $179,980.00 Total funding: $246,978.00
6/30/2028 — LADOT LANI - Westlake Transit Improvement Project
DOT150
1 $100K Construction CTIEP: $471,000.00 SAFTLU: $99,982.00 Total funding: $570,982.00
6/30/2027 — BOS CleanStat 3.0
— $85K —
—
2/1/2026Expired ⚠ BOS Waste Tire Amnesty Grant FY 2025-26
— $40K —
—
10/28/2027 — BSS TCC - Western/Slauson FLM
8 — Design —
— — BSS TCC - Cool Pavement Project
— — Design —
— —